The Zinc Expansion Project Lombador (ZEP Lombador), at Nerves-Corvo mine, consisted of the increase of the zinc production capacity, corresponding to the installation of new processing equipment for the extracted ore and the expansion of a number of surface infrastructures to support the Zinc Processing Facility and the underground expansion of the mine, due to the exploration of Phase 2 of the Lombador deposit.
QUADRANTE's Services consisted of Environmental and Archaeological Monitoring as well as the Construction Management and Commissioning of the Reinstallation of the Waste Network (Pipping HDPE500) composed by3 lines of 2 km length each.